Appendix A: Status of CWS Facilities Program as of 30 June 1945

Facility and Project Authorized Amount Date Authorized Construction Started Actual or Scheduled Initial Completion Percent Completed 6-30-45 Actual or Estimated (E) Final Completion Type of Contract
Grand Total $352,891,174.95
Government Owned and Operated, Total 310,657,270.30
Edgewood Arsenal, Edgewood, Md., Total 39,028,044.41
Rehabilitation Program 2,180,795.86 To 11-9-43 11-1-40 12-15-41 100 3-31-44 LS, FA
Rounding Out & Additions 22,596, 322.93 To 12-14-44 9-18-40 10-15-41 99 10-1-45 (E) FF, LS, FA, SD
Eastern CW Depot 2,439,011.00 To 3-13-44 9-17-40 6-27-11 100 7-5-44 LS, FF
CWS School 914,643.00 To 12-30-43 10-15-40 12-1-41 100 5-31-44 LS, FF, FA
Office & Troop Facilities 6,005,799.00 To 5-25-44 12-1-40 6-1-41 100 9-16-43 LS, FF, FA
Medical Division 1,617,814.00 To 12-5-44 6-9-43 3-15-44 100 6-30-45 LS, FF
Technical Division 915,544.29 To 12-30-44 10-20-42 1-20-43 99 8-1-45 (E) LS, FF, FA, SD
Maintenance, Repairs & Alterations 401,534.96 To 12-14-44 7-1-40 9-15-40 95 7-3145 (E) FA, SD
Prisoner of War Camp 22,507.00 To 11-16-44 8-20-44 9-28-14 100 4-3-45 LS
CG Fill. (Bldg. 84) WP Fill. (Bldg. 90) Mach. & Equip. 10,397.00 1-10-45 Data not available Data not available SD
H Distillation Plant, Construction, Mach. & Equip. 11,000.00 1-16-45 Data not available Data not available SD
CC-2 Plant—Revocation of Funds -75,000.00 1-23-45
Temperature control room (Med. Re- search Lab) 8,720.00 1-24-45 2-2-45 5-23-45 100 5-23-45 LS

Page 437

Enlargement of concrete aprons—Whses. & Magazines. 43,900.00 2-13-45 5-20-45 Not available 18 8-7-45 (E) LS
Constant Temperature rooms, Bldg_328, Addtl. Cost. 7,835.00 2-14-45
Prototype Target—Addti. Funds 20,874.78 2-16-45.
M77 Bomb Facility—Equipment 7,000.00 2-19-45 Data not available SD
Fire Damage to WP Fill. Bldg. 501 2,350.00 2-20-45 Data not available SD
Ventilating system, Impregnating Plant, Addtl. Cost. 9,000.00 3-2-45
Relocate Mach. & Equip., Gage Lab.—Inspect. Division. 3,814,38 3-28-45 Data not available SD
Pool Order, Machine tools for M74 Bomb Facilities. 1,800,000.00 4-12-45 Data not available SD
Refrigerated Storage Capacity, Addtl. Expansion. 56,000.00 6-7-45 Not available 7-21-45 (E) Not available.
Explosion Damage—Bldgs. 508, 509, Plants Area. 9,650.05 6-8-45 Data not available SD
Sprinkler system—Addtl. Cost 5,400.00 6-15-45
Decontamination of Ton Containers... 21,153.09 6-21-4C Not scheduled
Prisoner of War Camp—Reduction in Cost. -1,880,79 6-22-45
Prisoner of War Camp—Expansion—Reduction in Cost -6,141.00 6-29-45
Huntsville Arsenal, Huntsville Ala, Total 75,039,540,38
Original Chemical Plants 33,973,193.26 To 9-22-44 7-21-41 4-142 100 3-30-45 FF, LS, FA, SD
Chemical Plants, Addition No. 1 7,733,575.00 To 9-22-44 1-28-42 6-25-42 100 11-3042.... FF, SD
Chemical Plants, Addition No. 2 8,200,316,20 To 12-14-44 5-27-42 1-1-43 100 1-30-45 FF, FA, SD
Depot Storage 17,066,955.03 To 1-6-43. 1-2-42 3-6-42 100 3-15-43 FF, SD
NC & CN—DM Filling Plant 4,789,700.65 To 7-25-4-4. 10-4-43 1-30-44 100 1-30-44 FF, SD
Thionyl Chloride Plant 265,800 00 To 2-26-43. 3-15-43 4-15-43 100 4-15-43 FF
Carbonyl Iron Plant 603,600.00 To 9-25-43. 10-28-42 3-15-43 100 6-1-43 FF

Page 438

Appendix A: Status of CWS facilities program as of 30 June 1945—Continued

Facility and Project Authorized Amount Date Authorized Construction Started Actual or Scheduled Initial Completion Percent Completed 6-30-45 Actual or Estimated (E) Final Completion Type of Contract
Incendiary Bomb Filling Plants $1, 398,810.00 To 12-20-44. 12-28-42 4-15-43 Not available SD
CG Manufacturing and filling 99,530.37 To 11-10-44. 2-28-44 7-18-44 100 12-15-44 SD
Troop Facilities 527,287.00 To 5-16-44.. 6-24-42 3-26-43 100 5-1-45 LS
Prisoner of War Camp 16,775.00 To 11-3-44.. 7-14-44 8-28-44 100 8-28-44 LS
M69 Bomb, Cluster (E46) Wood containers. 10,000.00 1-6-45 Data not available SD
Gas Alarm Equipment 4,185.00 1-13-45 Data not available SD
WP Plant—Mach. & Equip. for unloading drums. 1,500.00 1-17-45 Data not available SD
Chemical Plants, Addition No. 1. Revocation of Funds. 250,000.00 1-23-45
Pilot Plant for HC 77,600.00 2-2-45 Authorized but postponed
Chlorine Plant—Caustic Fusion Pots.. 20,000.00 2-6-45 Data not available SD
Chlorine Plant—Caustic Fusion Pots 5,000.00 2-19-45 Data not available SD
Clothing Renovating Plant—Heating& Ventilating. 4,650.00 2-20-45 Data not available SD
CG Plant—Engineering Services 2,067.75 3-13-45 Data not available SD
Automatic Sprinkler systems 245,400.00 3-16-45 Not started 9-1-45 Not started 9-1-45 (E) LS
WP Plant—Mach. & Equip. for unloading drums, Addtl. Cost. 3,000.00 3-23-45 SD
WP Plants—Pallets, Mach. & Equip. 1,900.00 3-23-45 Data not available SD
Smoke Pot Filling—Mach. & Equip. 4,500.00 3-29-45 Data not available SD
M74 Bomb—WP Cup Filling—Mach. & Equip. 10,000.00 4-18-45 Data not available SD
Storage– HC Mix 7,500.00 4-12-45 6-4-45 7-26-45 45 7-26-45 (E) LS
Prisoner of War Camp 17,625.00 4-21-45 4-25-45 6-30-45 100 6-30-45 LS
WP Shell Filling—Mach. & Equip 3,000.00 5-8-45 Data not available SD

Page 439

Conversion M47A2 to M47A3 Bomb Filling Line. 3,000.00 5-9-45 Data not available SD
Original Chemical Plants—Revocation of Funds. 2,761.16 5-15-45
Chemical Plants, Addition No. 1. Revocation of Funds. 37,270.50 5-15-45
M74 Bomb Loading—Addtl Funds 51,000.00 5-16-45 SD
Launching Ramp 94,200.00 5-19-45 6-10-45 7-10-45 95 7-10-45(E) FF
Intend. Oil Filling Plant—Mach. & Equip. 24,200.00 6-2-45 Data not available SD
Proving Ground Conner]. Reduction of cost. -26,398.19 6-12-45
PWP Plant—Mach. & Equip 79,100.00 6-12-45 Data not available SD
HC Mix—Mach. & Equip 11,000.00 6-19-45 Data not available SD
Pine Bluff Arsenal, Pine Bluff, Ark., Total 66,652,031.60
Incendiary Bomb Filling Plant 21,909,945.78 To 12-5-44. 12-1-41 8-31-42 100 3-1-45 FF, LS, SD
Chemical Plants, Addition No. 21,436,225.35 To 11-23-44 3-15-42 9-15-42. 100 1-30-45 FF, LS, SD
Chemical Plants, Addition No. 2 10,169,334.63 To 12-28-44 6-23-42 1-1-43 99 7-15-45(E).. FF. LS, SD
Incendiary Bomb Depot 7,027,657.00 To 11-15-44 2-8-42 2-19-42 100 3-15-45 FF, LS
HC Filling Plants 2,438,342.00 To 6 6 44 11-17-42 4-1-43 100 2-1-45 FF, SD
Miscellaneous Loading Plants 1,485,275.00 To 11-25-44 10-6-42 3-31-43 95 7 -30-45 (E) FF, SD
Troop and Housing Facilities. 710,754.00 To 3-23-43 10-30-42 1-1-43 100 6643 FF
M50 Bomb Pump for use in Washing 5,000.00 1-10-45 Data not available SD
Chemical Plants Addition No. 1, Revocation of funds -84,781.63 1-23-45
Chlorine cells—Mach. & Equip 7,500.00 2-19-45 Data not available SD
Concrete slabs—12 whses 2,300.00 2-19-45 Not available Not available 100 3-1-45 LS
WP Cup Filling—Mach. & Equip 15,000.00 3-7-45 Data not available SD
Prisoner of War Camp. 6,189.00 3-20-45 4-2-45 5-15-45 100 5 -15 -45 PE
Chlorine Cells, Additional. 3,300.00 3-21-45 Data not available SD
Sprinkler system—expansion 8,940.00 3-31-45 2-17-45 I 7-15-45 71 7-15 -45 (E) LS

Page 440

Appendix A—Status of CWS facilities program as of 30 June 1945—Continued

Facility and Project Authorized Amount Date Authorized Construction Started Actual or Scheduled Initial Completion Percent Completed 6-30-45 Actual or Estimated (E) Final Completion Type of Contract
Chlorine Plant—Refrigeration Unit $22, 500.00 4-6-45 Data not available SD
Reworking M50 Bomb—Mach. & Equip. 17,045.00 4-17-45 Data not available SD
WP Plant—Settling Tank for Phossy water. 2,300.00 4-18-45 6-4-45 8-31-45 86 8-31-45(E) . . PE
4.2 RCM Shell Loading 1,436,000.00 4-18-45 5-7-45 10-15-45 20 10-15-45(E). FF
4.2 Shell Fuze—Machinery and Equipment. 9,000.00 4-25-45 Data not available SD
L.B.F. Plant—Revocation of Funds -11,858.01 5-15-45
Change house, WP Area—Revocation of Funds: -2,883.86 5-15-45
Change house, I.B.F. Area—Revocation of Funds. -1,452.66 5-15-45
Prisoner of War Camp—Expansion 400.00 5-28-45 4-2-45 5-15-45 100 5-15-45 PE
Conversion of M47A2 Bomb Line to M47A3. 40,000.00 6-6-45 Data not available SD
Rocky Mountain Arsenal, Denver, Colo., Total 39,837,061.31
Arsenal and Land 33,983,964.28 To 12-29-44. 6-2-42 1-1-43 99 7-14-45(E) . . FF, LS, SD
Oil Bomb Filling Plant 920,566.54 To 9-22-44.. 12-30-42 7-15-43 100 4-30-45 FF, LS, SD
DG Filling Plant (Temporary) 25,000.00 11-13-43.... 12-4-43 2-19-44 100 2-19-44 SD
M69 Bomb Loading Plant 56,945.00 To 7-18-44.. 3-13-44. 4-15-44. 100 5-12-44 LS
M74 Bomb Loading Plant 683,220.00 To 10-31-44. 9-12-44 2-28-45 100 3-1-45 FF, SD
HD Plant 1,608,000.00 8-15-44 8-15-44 4-30-45 100 4-30-45 FF
Oil Bomb Filling Plant—Revocation of Funds. -33,178.51 1-23-45
Chlorinated Paraffin Plant 225,000.00 2-7-45 2-17-45 5-15-45 100 5-15-45 FF

Page 441

Prisoner of War Housing 52,820.00 2-9-45 2-12-45 3-24-45 100 3-24-45 FF
Chlorinated Paraffin Plant—Equipment. 59,800.00 2-9-45 2-17-45 5-15-45 100 5-15-45 FF
Remodel of 6 whses 72,900 00 2-12-45 2-21-45 5-15-45 100 5-15-45 FF
Addtl. Cafeteria Facilities 25,000 00 3-13-45 3-20-45 5-20-45 100 5-20-43 FF
M69X Bomb Loading Facilities 1,331,022. CO 3-17-45 3-26-15 7-20-45 85 7-20-45 (E) FF
Addtl. WP Storage 96,200 00 4-7-45 4-20-45 7-19-45 87 7-19-45 (E) FF
M69X Bomb Loading Facilities Additional Funds, 901,460.00 4-16-45
Arsenal and Land—Revocation of Funds. -225,000.00 5-15-45
Sprinkler System—Addtl. Funds 42,942,00 6-21-45
Sprinkler system--Expansion 10,400 00 6-28-45
Camp Sibert, Gadsden, Ala., Total 16,213,000.00
Troop Training Facilities. 16,173,000 00 To 8-12-42 6-3-42 12-15-42 100 10-1-43. FF
Construction of Borden Project 5,000 00 10-1243 12-22-43 1-5-44 100 5-13-44 FA
Special CWS Laboratory 35,000 00 11-22-43 12-15-43 4-15-44 100 7-31-44 LS
Deseret Chemical Warfare Depot, Tooele, Utah, Total 10,946,213.00
Depot and Land 10,907,534.00 To 11-30-44 4-24-42 11-10-42 100 2-24-45 LS, FF
Bachelor Officers Quarters 9,612.00 10-15-43 11-18-43 1-31-44 100 2-15-44 UP
Trailer Project (50 Families) 23,700.00 11-20-44 12-4-44 2-145 100 2-1-45 LS
Prisoner of War Stockade 7,552.00 1-2-45 11-15-44 12-15-44 100 12-15-44 Not available
Depot—Revocation of Funds -6,000.00 3-12-45
Prisoner of War Stockade—Expansion 3,815.00 5-15-45

Page 442

Appendix A: Status of CWS facilities program as of 30 June 1945—Continued

Facility and Project Authorized Amount Date Authorized Construction Started Actual or Scheduled Initial Completion Percent Completed 6-30-45 Actual or Estimated (E) Final Completion Type of Contract
Dugway Proving Ground, Tooele, Utah, Total $1,692,985. 14
Proving Ground and Quarters 1,471,625.00 To 12-30-44. 2-14-42 8-20-42 100 5-1-45 LS, UP
Addtl. Bldgs. and Igloos—Addtl. Cost 25,190.00 1-4-45
New Target Area 8,000.00 4-3-45 5-3-45 6-16-45 85 8-1-45 (E) LS
Addtl. Chemistry Laboratory 60,530.00 4-30-45 6-25-45 10-1-45 5 10-1-45 (E) LS
Hangar—Gasoline Systems—Revocation of Funds. -59.86 5-15-45
Special Testing Facilities 10,000.00 5-21-45 5-28-45 6-4-45 100 6-4-15 LS
Two Whses. for Tech. Div. & Med. Research Center. 27,700.00 5-28-45 6-28-45 9-15-45 0 9-15-45 Not avail-able.
Special Testing Facilities—Expansion 90,000.00 5-30-45 5-30-45 6-30-45 100 6-30-45 LS
Camp Detrick, Frederick, Md.
Special Project 13,951,503.59 To 5-15-45 4-15-43 5-31-45 100 CPFF
Granite Peak Installation, Tooele, Utah
Special Project 1,474,885.00 To 9-4-44 7-10-44 1-1-45 100 CPFF
Horn Island Installation, Pascagoula, Miss.
Special Project 454,592.90 To 5-15-45 6-28-43 10-30-44 100 CPFF
Vigo Plant, Terre Haute, Ind.
Special Project 29,777,851.97 To 5-15-45 5-15-44 7-1-45 100 CPFF

Page 443

Clothing Renovating Plants
Columbus, Ohio
Kansas City, Missouri 3,053,515.00 To 6-6-45 6-1-41 12-15-41 100 2-15-45 FF
New Cumberland, Penns
Ogden, Utah
Authorized since last report, $133,955.00. Note: Ogden Plant dismantled prior to completion for shipment overseas.
Depot Storage
Ogden, San Antonio, Memphis, New Cumberland, Atlanta, Panama, Hawaii, Philippines 12,205,906.00 6-13-40 7-15-40 5-19-41 100 5-19-41 FF
Chemical Transportation
Chlorine Tank Cars, Freight Cars 330,140.00 3-15-42 3-15-42 6-15-42 100 10-15-42 LS
Government Owned and Contractor Operated, Total 42,233,904.65
Niagara Falls Plant, Niagara Falls, N.Y., Total. 5,711,648,68
CC-2 Plant No. 1 2,704,413.47 To 9-22-44 2-2-41 9-4--41 100 12-31-43 FF
CC-2 Plant No. 2 3,063,000.00 To 9-22-44 10-5-42 4-1-43 100 11-15-43 FF, LS
CC-2 Plant No. 1—Revocation of Funds. -2,834.60 ... 5-15-45
CC-2 Plant Na, 2—Revocation of Funds. -52,930.19 ... 5-15-45
Midland Plant, Midland, Mich., Total 5,233,525.90
CC-2 Plant No. 1 2,277,771.19 To 9-22-44 2-6-41 12-16-41 100 1-15-42 FF
CC-2 Plant No. 2 2,957,793.00 To 9-22-44 9-18-42 8-15-43 100 4-15-44 LS
CC-2 Plant No, 2—Revocation of Funds. 2,038.29 5-15-45

Page 444

Appendix A—Status of CWS facilities program as of 30 June 1945—Continued

Facility and Project Authorized Amount Date Authorized Construction Started Actual or Scheduled Initial Completion Percent Completed 6-30-45 Actual or Estimated (E) Final Completion Type of Contract
St. Louis Plant, East St. Louis, Ill., Total $6,373, 311.41
CC-2 Plant No. 1 2,518,962.06 To 9-22-44 2-1-41 12-31-41 100 1-15-42 FF
CC-2 Plant No. 2 2,837,000.00 To 9-22-44 6-23-42 3-1-43 100 12-14-13 FF
CC-2 Plant No. 1—Revocation of Funds. -491.02 5-15-45
CC-2 Plant No. 2—Revocation of Funds. -176,019.34 5-15-45
Dichloroamine-T Plant (Converted to S-330) 831,851.81 To 9-22-44 3-21-41 1-25-42 100 5-31-43 FF
Revocation of Funds -66,005.23 5-15-45
S-330 Plant (Converted Dichloroamine-T Plant) 437,500.00 1-28-44 2-15-44 7-15-44 100 8-11-44 FF
Interim Plant (S-330) 36,017.00 To 9-28-44.. 3-1-44 7-15-44 100 Not available Not available
Repair of Storage Tanks 4,500.00 4-26-45 Data not available
S-330 Plant—Revocation of Funds -50,003.87 5-15-45
Marshall Plant, New Martinsville, W. Va., Total 4,953,295.00
Acetylene tetrachloride, HC and RH-195 Plant (Trichlorethylene) 5,013,295.00 To 12-13-44. 7-2-43 9-1-43 100 2-20-45 FF
Revocation of Funds -60,000.00 1-23-45

Page 445

Kanawha Plant, South Charleston, W. Va., Total 1,298,105.84
Hexachlorethane Plant 1,277,739.00 To 9-22-44 8-30-42 2-1-43 100 10-21-43 FF
Dismantling and disposition 29,100.00 12-22-44 5-7-45 6-23-45 100 6-10-45 LS
Revocation of Funds -1,500.00 1-23-45
Revocation of Funds -7,233.16 7-15-45
Fostoria Plant, Fostoria, Ohio, Total 2,497,905.00
Charcoal—Whetlerite Plant No. 1 1,197,905.00 To 9-16-44 4-1-41 12-23-41 100 1-10-42 FF
Charcoal—Whetlerite Plant No. 2 1,300,000.00 3-2-42 5-11-42 2-11-43 100 6-31-43 FF
Maury Plant, Columbia, Tenn.
Charcoal—Whetlerite Plant 2,307,576.18 To 4-18-44 4-23-42 4-1-43 100 4-30-43 FF
Seattle Plant, Seattle, Wash., Total 799,691.24
Charcoal-Whetlerite Plant and Acquisition. 796,491.24 To 9-22-44 3-30-43 12-31-43 100 2-29-44 FF, Mfg.
Sprinkler System 3,500.00 10-12-44 12-1-44 1-15-45 100 1-15-45 LS
Revocations Funds -300.00 5-15-45
Owl (4X) Plant, Azusa, Calif., Total 6,449,982.88
Original Plant and Expansion 7,850,000 00 To 2-21-44 11-6-43 4-15-44 100 3-21-45 FF
Revocation of Funds -1,400,000.00 1-23-45
Revocation of Funds -17.12 5-15-45
Firelands Plant, Marion, Ohio
Mixing and Loading Plant 726,665.00 To 9-12-44 12-4-43 4-15-44 85 9-1-45 (E) FF, LS

Page 446

Appendix A—Status of CWS facilities program as of 30 June 1945—Continued

Facility and Project Authorized Amount Date Authorized Construction Started Actual or Scheduled Initial Completion Percent Completed 6-30-45 Actual or Estimated (E) Final Completion Type of Contract
Birmingham Plants, Birmingham, Ala., Total $491,546.49
Smoke Mix (Type C) Plant 187,837.00 To 6-26-44.. 12-26-43 4-15-44 100 6-30-44 FF
Smoke Pot (HC) M5 Loading Plant.... 303,922.00 To 12-19-44. 4-17-44 7-15-44 100 9-15-44 FF
Smoke Mix Plant—Revocation of Funds. -199.98 5-15-45
Smoke Pot Plant—Revocation of Funds. -82.53 5-15-45
Duck River Plant, Columbia, Tenn., Total 3, 317,444.25
CG Mfg. & CO Cleaning Plant 2,851,952.00 To 8-29-44 5-6-44 12-15-44 100 1-26-45 FF
Hoists for Ton Containers 500.00 2-2-45 Data not available
Additional Funds to complete 465,149.75 4-3-45
Revocation of Funds -157.50 5-15-45
San Bernardino Loading Plant, San Bernardino, Calif., Total 1,047,228.14
Bomb Loading Plant 193,136.00 To 12-7-44 3-1-44 4-17-44 100 Not avail- able. LS, SD
Mach. & Equip. for Loading Bombs.... 80,000.00 6-28-44 Data not available
Tarpaulins for Storage 15,000.00 12-11-44. Data not available
M69X Bomb Line (Pilot) 40,000.00 3-29-45 Data not available
Conversion of M69 Bomb Line to M69X. 719,100.00 4-23-45 5-18-45 8-15-45 15 8-15-45(E) .. LS
Revocation of Funds -7.86 5-15-45

Page 447

Zanesville Plant, Zanesville, Ohio, Total 743,350.00
Charcoal—Whetlerite Plant 733,350.03 To 7-15-44 12-16-40 1-5-42 100 10-15-44 Mfg.
Funds to Place Plant in Standby 10,000.00 11-10-44 Data not available
Turlock Plant, Turlock, Ca
Total 282,628.64
Bomb Loading Plant (Previously reported for Chemurgic Corp.). 183,750.00 To 12-26-44 Data not available
Funds to Terminate Contracts Prior to Acquisition. 98,878.64 2-2-45 Data not available

CPFF—Cost Plus Fixed Fee

FF—Fixed Fee

LS—Lump SUM

Mfg.—Manufacturing Contract

PE—Accomplished by Post Engines

FA—Force Account (Purchase and Hire)

SD—Service Division (Maintenance and Repair Organization at Arsenals)

Source: Report compiled semiannually by the Corps of Engineers for use of Headquarters, ASK entitled “Facilities (including construction) Program, Chemical Warfare Service.” The date of this particular report was 30 June 45.

Page 448

Appendix B: Government Investment in Facilities, World War II as of 31 December 1945

Cost to Government
Arsenals and Plants Acreage Total Land Construction Equipment & Production Machinery Other
408,983 $315,658,264 $6,350,341 $235,800,100 $56,328,812 $17,179,011
ARSENALS AND PLANTS
Edgewood Arsenal Edgewood, Md 900 37,586,969 70,751 26,592, 146 8,583,562 2,340,510
Huntsville, Arsenal Huntsville, Ala 22,890 58,431,200 1,205,174 43,681, 939 8,392,394 5,151,693
Pine Bluff Arsenal Pine Bluff, Ark 5,170 51,156,748 77,005 35,912, 468 12,133,820 3,033,455
Rocky Mountain Arsenal Adams County, Colo 19,614 35,061,097 1,242,791 17,705, 504 10,464,557 5,648,245
Bell Machine Co.Oshkosh, Wis.a 0 83,516 50 83,466 0 0
Birmingham HC Smoke Mix Plant Birmingham, Ala.Ferro Enamel Corp. Plant #2 2 148,201 0 94,956 13,162 40,083
Birmingham Smoke Pot Plant Birmingham, Ala. Ferro Enamel Corp. Plant #3 2 120,378 0 60,948 0 59,430

Page 449

Columbus Clothing Renovating Plant, Columbus, Ohio 2 687,143 0 356,572 311,570 19,001
Duck River CWS Plant, Columbia, Tenn 11 3,383,130 0 2,858,636 467,(:09 57,485
Dugway Proving Ground, Salt Lake City, Utah (Machine Repair Shop for CWS Equipment) 1 77,600 0 24,930 46,170 6,500
Fencil, William C., Co., Huntley, Ill 48 82,000 0 82,000 0 0
Ferro Enamel Corp., Bedford, Ohio 5 331,417 3,138 222,246 106,033 0
Firelands CWS Plant, Marion, Ohio, Ferro Enamel Corp. 0 362,185 0 0 362,185 0
Fostoria CWS Plant #1, Fostoria, Ohio, National Carbon Co. 10 678,660 6,300 460,768 122,871 38,721
Fostoria CWS Plant #2, Fostoria, Ohio, National Carbon Co 2 848,824 1,500 545,100 266,224 36,000
Grant, Camp, Rockford, Ill., (Dismantling of Gas Masks) 0 2,012 0 0 2,012 0
Kanawha CWS Plant, South Charleston, W. Va., Westvaco Chlorine Products Corp 1 263,345 0 263,345 0 0
Kansas City CWS Plant, Kansas City, Mo 2 747,223 0 345,462 195,294 206,462

Page 450

Appendix B: Government Investment in Facilities, World War II as of 31 December 1945—Continued

Cost to Government
Arsenals and Plants Acreage Total Land Construction Equipment & Production Machinery Other
408,983 $315,658,264 $6,350,341 $235,800,100 $56,328,812 $17,179,011
ARSENALS AND PLANTS—Continued
Marshall CWS Plant, New Martinsville, W. Va., E. I. du Pont de Nemours & Co., Inc. 84 5,186,279 39,163 2,127, 165 2,673,288 346,613
McCoy, Camp, Camp McCoy, Wis. (Dismantling of Gas Masks) 0 12,328 0 0 12,328 0
Midland CWS Plant, Midland, Mich., Dow Chemical Co 10 5,415,289 0 2,143,526 3,250,385 21,378
New Cumberland CWS Plant, New Cumberland, Pa 2 341,111 0 341,111 0 0
Niagara Falls CWS Plant, Niagara Falls, N.Y., E. I. du Pont de Nemours & Co., Inc. 9 5,028,363 51,930 3,719,810 1,194,606 62,017
Owl 4X Plant, Azusa, Calif., American Chemical-Cyanamid Corp 36 4,593,062 0 2,351,113 2,218,159 23,790
Rheem Manufacturing Co. Houston. Tex. a 0 877,438 9,419 546,256 321,763 0

Page 451

San Bernardino CWS Plant, San Bernardino, Calif., Day & Night Flare Corp 594 461,334 0 296,900 164,434 0
Seattle CWS Plant, Seattle, Wash 16 893,740 231,013 242,171 420,556 0
St. Louis CWS Plant, Monsanto, Ill., Monsanto Chemical Co 22 5,758,613 16,764 3,024,807 2,642,178 74,864
Turlock CWS Plant, Turlock, Calif., Day & Night Flare Corp 154 554,760 7,700 376,658 157,638 12,764
Vigo CWS Plant, Terre Haute, Ind 6,148 29,166,774 784,001 27,362,173 1,020,600 0
Zanesville, CWS Plant, Zanesville, Ohio 0 203,785 0 0 203,785
DEPOTS AND WAREHOUSES
Deseret CWS Depot Tooele, Utah 16,564 7,853,383 65,716 7,787,667 0 0
Eastern CWS Depot-Training Center Edgewood, Md 3,872 7,297,130 302,016 6,995,114 0 0
Gulf CWS Depot Huntsville, Ala 16,000 9,717,710 832,000 8,885,710 0 0
Indianapolis CWS Depot Indianapolis, Ind 1 0 40 0 0 0
Midwest CWS Depot Pine Bluff, Ark 9,852 7,172,546 192,981 6,979,565 0 0

Page 452

Appendix B: Government Investment in Facilities, World War II as of 31 December 1945—Continued

Cost to Government
Acreage Total Land Construction Equipment & Production Machinery Other
408,983 $315,658,264 $6,350,341 $235,800,100 $56,328,812 $17,179,011
DEPOTS AND WAREHOUSES—Continued
Northeast CWS Depot, Modeltown, N.Y. 0 0 d 0 0 0 0
Chicago CWS Warehouse, Chicago, Ill 0 210,268 0 0 210,268 0
New York CWS Warehouse, New York, N.Y. 0 321,956 0 0 321,956 0
BW INSTALLATIONS
Detrick, Camp, Frederick, Md. 560 12,625,716 70,100 12,555,616 0 0
Horn Island Reservation, CWS, Horn Island, Mississippi 1,969 0 0 0 0 0
Pascagoula CWS Project, Pascagoula. Miss 4,155 475,000 0 475,000 0 0

Page 453

OTHERS
Dugway Proving Ground, Tooele, Utah 261,280 3,777,956 b 0 3,777,956 0 0
Sibert, Camp, Attalla, Ala 38,996 17,662,125 1,140,829 16,521,296 0 0

a Defense Plant Corporation and War Department funds. The Maury CWS plant, Columbia, Tenn., built in 1942, was in standby status in 1943 and by 31 December 1945 had been declared surplus and was in the hands of the Corps of Engineers. Total cost to government was $1,330,248.

b 253,440 acres under permit from Interior Dept. Declared inactive 1 Oct. 1945.

c All under lease.

d Land and construction cost data included in Lake Ontario Project, Engineer Redistribution-Storage Facility.

e 1,969 acres public domain. Declared surplus 1 Oct. 1945.

Source: Corps of Engineers, Quarterly Inventory of War Department Owned, Sponsored and Leased Facilities, 31 December 1945, RCS AMD-1.

Page 454

Blank page